Sudbury Inco and Falconbridge
|
|
|
Production Rates
Inco 2005 Mill
|
|
96,673 tonnes nickel-in-concentrate |
|
|
|
117,618 tonnes copper-in-concentrate |
|
|
|
3,259 tonnes cobalt-in-concentrate |
Falconbridge 2005 Mill
|
|
19,708 tonnes nickel-in-concentrate |
|
|
|
23,367 tonnes copper-in-concentrate |
|
|
|
354 tonnes cobalt-in-concentrate |
Reserves
(as of December 31, 2005)
Inco
|
|
Proven: 69.3 million tonnes
grading 1.22% nickel and
1.32% copper |
|
|
|
Probable: 93.7 million tonnes
grading 1.22% nickel and 1.31%
copper |
Falconbridge
|
|
Proven: 3.2 million tonnes
grading 1.26% nickel and
1.78% copper |
|
|
|
Probable: 4.9 million tonnes
grading 1.13% nickel and
1.27% copper |
Resources
(as of December 31, 2005)
Inco
|
|
Measured: 11.3 million tonnes
grading 1.19% nickel and 1.07%
copper |
|
|
|
Indicated: 35.6 million
tonnes grading 1.40% nickel
and 1.14% copper |
|
|
|
Inferred: 47.7 million tonnes
grading 1.78% nickel and 1.94%
copper |
Falconbridge
|
|
Measured: 3.3 million tonnes
grading 1.85% nickel and 0.61%
copper |
|
|
|
Indicated: 17.2 million
tonnes grading 2.38% nickel
and 1.09% copper |
|
|
|
Inferred: 29.0 million tonnes
grading 1.80% nickel and 2.60%
copper |
Sudbury A Century of Mining
Inco and Falconbridge have been mining nickel-copper ores in the Sudbury area of
northern Ontario since 1902 and 1929, respectively. Today, Incos Sudbury operations
consist of six underground mines, one mill, one smelter and one refinery, employing
approximately 6,400 people. Falconbridge operations consist of three underground
mines, a mill and a smelter, employing approximately 1,500 people.
These facilities
are spread throughout the 60-kilometre-long, oval-shaped geological formation known as
the Sudbury Basin. Nickel and copper are the primary metals produced, but cobalt and
precious metals such as platinum and palladium are also recovered.
Sudbury Geology
The nickel-copper ore deposits in Sudbury are associated with a large body of
igneous rock known as the Sudbury Igneous Complex (SIC). The SIC has an elliptical
shape with the major axis striking northeast for a distance of 60 kilometres and the
minor axis approximately 27 kilometres long. The widely held belief is that the SIC is
the product of a meteorite impact.
The mineralization in the deposits consists of zones of massive, inclusion-bearing
massive, stringer and disseminated sulphides associated with brecciated host rocks
located in footwall troughs or embayments around the outer, lower edge of the SIC. The
minerals pyrrhotite, pentlandite, chalcopyrite and pyrite are the major sulphides in
the Sudbury ores. Magnetite is a common oxide mineral. Pentlandite is the main
nickel-bearing sulphide with a nickel content of 33 to 35 weight percent. It also
contains an average of 1 weight percent cobalt. Chalcopyrite is the main
copper-bearing sulphide with a copper content of about 33 weight percent.
|
|
|
Sudbury Mines
|
|
|
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Three mining zones shaft 3,400 feet |
|
|
|
Uses post pillar cut and fill in the main and west orebodies |
|
|
|
Uses narrow vein drift and fill in the 153 orebody |
|
|
|
Currently developing new footwall copper orebody 170 |
|
|
|
Employs approximately 460 people |
History
1892 Discovered by Thomas Baycroft
1942 Purchased by Inco
1970 Coleman began production
1982 Production suspended
1989 Production reactivated
1996 McCreedy East mine accessed via an underground ramp from Coleman shaft
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Five mining zones shaft 4,200 feet |
|
|
|
Slot and slash is current primary mining method |
|
|
|
Vertical retreat mining method used in the 100 orebody |
|
|
|
Uppers retreat mining occurs in the 138 orebody |
|
|
|
Orebodies open to depth |
|
|
|
Employs approximately 270 people |
History
1884 First ore discovered by Thomas Frood
1886 Mine opened by Canadian Copper Co.
1963 #2 shaft sunk to access high grade 138 orebody
1978 Production suspended
1984 Production reactivated
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Six mining zones shaft 4,250 feet |
|
|
|
Uppers retreat mining used in 80% of mining |
|
|
|
Uses mechanized cut and fill, uppers retreat mining and slot and slash method in remaining
20% |
|
|
|
Orebodies open to depth |
|
|
|
Employs approximately 304 people |
History
1885 Evans orebody discovered by F.J. Eyre
1889 Evans pits worked to a depth of 250 feet
1940-1960 Surface diamond drilling ore discovered north of the 800 orebody
1970 Production began
2004 880 orebody breakthrough to North mine established
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Seven mining zones shaft 7,137 feet |
|
|
|
Ramp extended to 7,810 feet |
|
|
|
Predominant mining method is slot and slash with mechanized cut and fill used in the 3,000
complex |
|
|
|
Orebody open to depth |
|
|
|
Employs approximately 373 people |
History
1856 First discovered by A.P. Salter
1886 Rediscovered by H. Ranger
1901 First ore produced from open pit
1925 Inco purchased property
1928-1935 Series of shaft sinking reached 5,400 level
1969 #9 shaft sunk to 7,137 feet
2006 Ramp currently down to 7,810 level
|
|
|
Sudbury Mines
|
|
|
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Six mining zones two shafts with deepest to 4,075 level |
|
|
|
Frood and Stobie use primarily sub-level cave method of mining with vertical retreat method
used mostly below 2,400 level and some uppers retreat method in pillar recovery |
|
|
|
Employs approximately 451 people |
History
1883 Ore discovered by CPR construction crew
1884 Orebody staked by Thomas Frood
1911 Shaft sinking began at Frood mine
1938 Open pit mining began at Frood mine
1941 Open pit mining began at Stobie mine
1965 #9 shaft sunk to service Frood and Stobie
2000 Frood and Stobie merged
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Three mining zones shaft to 4,250 level |
|
|
|
Uses slot slash and uppers retreat methods of mining |
|
|
|
Employs approximately 197 people |
History
1891 Discovered by John Cryderman
1908 First production from #1 shaft
1929 Inco acquired property from Mond Nickel
1937 Mine reopened at 1,200 TPD
1986 Underground portion temporarily suspended
1994 Reopened
2005 Ramp completed to 5,100 level
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Produces nickel and copper |
|
|
|
Falconbridges largest operating mine in Sudbury |
|
|
|
Seven mining zones shaft 4,921 feet |
|
|
|
Uses open stope mining, plus cut and fill methods |
|
|
|
Employs approximately 300 people |
History
1950 Discovered east of Falconbridges Onaping mine
1958 Onaping mine began production
1985 Craig production began via Onaping shaft
1992 Production continued via Craig shaft
1997 Craig and Onaping amalgamated
1999 Onaping included as part of Craig mine
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Six mining zones |
|
|
|
Shaft depth: production shaft 5,000 feet; service shaft 5,000 feet |
|
|
|
Uses open stope mining, plus cut and fill methods |
|
|
|
Employs approximately 405 people |
History
1929 Falconbridge acquired the claims
1951 Surface drilling began at nearby Strathcona
1956 Surface drilling began at Fraser mine
1968 Strathcona began ore production
1983 Fraser mine began ore production
1999 Link between Fraser and Strathcona completed
2000 Fraser and Strathcona merged
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Produces copper, nickel and precious metals |
|
|
|
Three mining zones shaft 5,374 feet |
|
|
|
Uses open stope mining, plus cut and fill methods |
|
|
|
Located adjacent to Incos undeveloped Blezard property |
|
|
|
Employs approximately 165 people |
History
1885 Stobie outcrop discovered
1935 Falconbridge acquired claims
1941-1956 Drilling occurred
1969-1974 Drilling occurred
1971 Preliminary mine development began; halted for economic reasons
1989 Shaft sinking began
1991 Production began
|
|
|
Sudbury Processing Facilities
|
|
|
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Built in 1971 |
|
|
|
Receives ore from six different mines by rail (Stobie, Creighton, Coleman)
and truck (North, South, Garson) |
|
|
|
Currently produces one bulk copper-nickel concentrate for the Copper Cliff smelter |
|
|
|
New copper circuit planned to start producing copper concentrate (150,000 tonnes/year) in
late 2006 |
|
|
|
Current capacity of 33,500 tonnes/day peak for annual capacity of 9.5 million tonnes per year |
|
|
|
SAG mill processes approximately 19,000 tonnes/day with conventional
crushing circuit and two parallel rod mills at 14,500 tonnes/day (with five
parallel ball mills) to give 56% -200 mesh |
|
|
|
Revert circuit designed to feed crushed material (slag, bricks, ore) to dedicated rod mill |
|
|
|
Employs approximately 184 people at Clarabelle plus 40 people in tailings and water treatment
plants |
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Processing facilities include a bulk (nickel and copper) smelter circuit, a matte processing
plant, a copper smelter as well as a sulphuric acid plant, liquid
SO2 plant and two
oxygen plants |
|
|
|
Smelts nickel-copper concentrate primarily from Incos Sudbury and Voiseys Bay operations |
|
|
|
Processes third-party mineral concentrates and other third-party recycled feed materials |
|
|
|
Bulk smelter uses two Inco flash furnaces to smelt mineral concentrates with
high purity oxygen to
produce a matte product; the matte is further purified in converters, cast, cooled,
crushed and milled to separate the nickel and copper; most of the nickel product is
roasted and copper product is further processed to anode copper |
|
|
|
Smelter complex produces nickel oxides and metallics (platinum-group metals
containing product) that are sent to the Inco refineries for further refining,
Sinter 75 (a 75% nickel oxide) that is sold, and copper anodes that are refined
at Falconbridges CCR copper refinery in Montreal |
|
|
|
Production capacity is 600 million pounds per year of copper and nickel in various products
annually |
|
|
|
An Inco smelter has operated at Copper Cliff since 1930, the flash furnaces and acid plant
since 1993 |
|
|
|
Employs approximately 685 people |
2005 Smelter Production Rates
|
|
97,500 tonnes nickel in products shipped to refineries or markets |
|
|
|
100,200 tonnes net copper to refineries |
|
|
|
1,340 tonnes cobalt in products shipped to refineries |
|
|
|
Sudbury Processing Facilities
|
|
|
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Copper Cliff Nickel refinery began operation in 1972 |
|
|
|
Processes nickel oxide and nickel sulphides from the Copper Cliff smelter;
also processes nickel containing residues from the Clydach Nickel refinery
as well as purchased nickel/cobalt/platinum-group metal feeds; materials are
melted in two top-blown rotary converters and granulated |
|
|
|
Inco Pressure Carbonyl (IPC) plant extracts nickel from the granules into a
gaseous nickel carbonyl phase; three reactors at operating pressures of 1,000
psi and extraction efficiency of approximately 97.5% |
|
|
|
Decomposition of nickel carbonyl by heating to produce nickel pellets,
discs, chips and powders at 99.99% purity |
|
|
|
Residues containing the Ontario operations cobalt and platinum-group metals
are processed in the Electrowinning Department where copper is removed (plated
to cathodes) and impurities are treated |
|
|
|
Employs approximately 305 people |
2005 Copper Cliff Nickel Refinery Production Rates
|
|
56,534 tonnes nickel pellet and powder |
|
|
|
8,188 tonnes copper cathode |
|
|
|
Port Colborne refinery began operation in the early 1900s |
|
|
|
Processes nickel/cobalt carbonate from electrowinning to produce cobalt rounds;
nickel carbonate is returned to the Copper Cliff smelter |
|
|
|
Upgrades platinum-group metal residues from electrowinning to produce a
cake for the Acton refinery; lead carbonate is sold to the Falconbridge
Brunswick smelter |
|
|
|
Performs shearing/packaging services for Thompson nickel cathode and Copper
Cliff Nickel refinery nickel pellet/discs |
|
|
|
Employees approximately 190 people |
2005 Port Colborne Refinery Production Rates
|
|
1,225 tonnes cobalt |
|
|
|
596,100 troy ounces platinum-group metals and gold |
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Produces two concentrate streams: nickel-copper concentrate that goes to
Falconbridges Sudbury smelter, and a copper concentrate that goes to the Kidd
Metallurgical Division in Timmins |
|
|
|
Built in 1968 |
|
|
|
Capacity of approximately 3 million tonnes per year |
|
|
|
Crushing plant 2-stage crushing to half inch size |
|
|
|
Nickel and copper ores are blended before milling |
|
|
|
Milling at 370 tonnes per hour in two parallel roll mill/ball mill circuits (55% -200 mesh) |
|
|
|
Employs approximately 92 people |
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Processing facilities include a smelter and a sulphuric acid plant |
|
|
|
Smelts nickel-copper concentrates from Sudbury and Raglan mines |
|
|
|
Processes custom feed materials |
|
|
|
Smelters electric furnace converts the mineral concentrate into a
high-grade matte containing nickel, copper, cobalt and platinum group
metals |
|
|
|
Capable of producing 130,000 tonnes of nickel-copper matte annually |
|
|
|
Smelted and granulated matte is sent by rail to Québec City, then
shipped overseas to the Nikkelverk refinery in Norway for refining
into pure metals |
|
|
|
Originally built in 1928 and has been expanded and upgraded since |
|
|
|
Employs approximately 270 people |
2005 Smelter Production Rates
|
|
63,093 tonnes nickel-in-matte |
|
|
|
20,798 tonnes copper-in-matte |
|
|
|
2,423 tonnes cobalt-in-matte |
|
|
|
Sudbury Growth Projects
|
|
|
Sudbury Growth Projects
After more than a century of mining
in the area, the Sudbury Basin continues
to provide promising growth prospects for
the future. Both Inco and Falconbridge
continue to identify and advance projects
that will ensure the next generation of
mining activity in Sudbury.
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Discovered in 2001, Nickel Rim South promises to be one of the lowest cost mines
in the history of Falconbridges Sudbury operations |
|
|
|
Scheduled to commence production in 2009, with a minimum 12-year mine life |
|
|
|
Located immediately adjacent to Incos Victor property and nine kilometres
north of Falconbridges Sudbury smelter |
|
|
|
High grade mineral resource located between 3,600 foot and 5,900 foot depth |
|
|
|
High-grade 13.4 million tonne inferred resource grading 1.8% nickel, 3.3%
copper, 0.04% cobalt, 1.8 g/t platinum, 2.0 g/t palladium and 0.8 g/t gold |
|
|
|
A five-year deposit definition program began in the first quarter of 2004 |
|
|
|
Capital investment to bring the mine into production is estimated to be US$524 million |
|
|
|
Decision to proceed with feasibility study for full mine development to be made
after underground exploration program is completed in 2008 |
|
|
|
Outstanding health and safety record; reaching one million working hours
without a lost-time injury in August 2005 |
|
|
|
Comprehensive Environmental Management System provides for responsible
stewardship of the site and surrounding environment |
Project
Timeline
|
|
September 2003 Began shaft pilot hole drilling |
|
|
|
March 2004 Began site preparation |
|
|
|
February 2005 Began ventilation shaft sinking |
|
|
|
April 2005 Began main shaft sinking |
|
|
|
June 2005 Surface plant completed |
|
|
|
February 2007e Begin underground lateral development |
|
|
|
January 2008e Begin underground diamond drilling |
|
|
|
November 2008e Complete deposit definition |
|
|
|
December 2009e Complete project |
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Initial discovery in 1944 of the near surface 725 zone; 720 and 740 zones discovered in 1955 |
|
|
|
Intermittent surface and underground exploration programs
from 1950s-early 1990s
identified significant mineralization; follow up exploration drilling from
1995-2000 intersected mineralization to 5,600 level |
|
|
|
Additional exploration drilling in 2005/2006 to support prefeasibility level of study |
|
|
|
Located adjacent to existing Copper Cliff South mine |
|
|
|
Indicated/inferred resources of 11.4 million tonnes grading 1.72% nickel, 1.41%
copper, 0.04% cobalt, 1.42 g/t platinum, 1.86 g/t palladium and 0.52 g/t gold |
|
|
|
Scoping level study is ongoing based on results from recent exploration program |
|
|
|
Sudbury Growth Projects
|
|
|
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Three-compartment timbered shaft currently sunk to 4,100 feet; exploration
drifts driven on 650, 1,250 and 1,850 levels; little infrastructure
underground; development work suspended in 1972 |
|
|
|
Mineable reserve of 7.8 million tonnes grading 1.46% nickel, 2.03% copper,
0.04% cobalt, 1.97 g/t platinum, 2.08 g/t palladium and 0.75 g/t gold |
|
|
|
Indicated/inferred resources of 1.46 million tonnes grading 0.89% nickel, 1.68%
copper, 0.02% cobalt, 1.41 g/t platinum, 1.49 g/t palladium and 0.53 g/t gold |
|
|
|
Currently preparing project feasibility study |
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Located adjacent and north of Nickel Rim South |
|
|
|
In 1974, surface exploration drilling discovered the Victor Main contact
mineralization between the 5,000 feet and 5,500 feet levels |
|
|
|
The 1989 exploration, utilizing borehole UTEM technology, resulted in the
discovery of the Victor deep footwall mineralization at the 8,000 feet level |
|
|
|
From 1995-1998 completed advanced underground exploration program (shaft
sinking, drifting and exploration diamond drilling) |
|
|
|
Current indicated contact resource is 7.6 million tonnes grading 1.67%
nickel, 0.34% copper and 0.3 g/tonne PGE-Au. |
|
|
|
The inferred contact resource is 6.3 million tonnes grading 1.5% nickel, 0.4%
copper and 0.3 g/tonne PGE-Au with an additional 6.16 million tonnes of inferred
footwall resource grading 1.9% nickel, 6.2% copper and 6.7 g/tonne platinum-group
elements-gold |
|
|
|
Significant exploration potential for the discovery of high-grade footwall,
copper precious metal orebodies and expansion of the contact orebodies and
high-grade copper-nickel areas within them; high-grade copper precious metal zones
have been identified at depth and Falconbridge has discovered copper precious
metals zones at its Nickel Rim South project; it is believed that additional
exploration will discover additional footwall mineralization |
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Orebody located two kilometres from Fraser mine |
|
|
|
Subject of exploration programs since 1995 |
|
|
|
Currently hosts four zones of mineralization within a 2.5 kilometre strike
length; resources as of December 31, 2005 totaled 3.3 million tonnes of measured
resources grading 1.85% nickel and 0.61% copper, 1.55 million tonnes of indicated
resources grading 1.69% nickel and 0.46% copper, and 2.4 million tonnes of
inferred resources grading 1.8% nickel and 0.5% copper |
|
|
|
Pre-feasibility study is awaiting the results of a continuing underground
exploration drifting and drilling program |
Key Facts
|
|
100% ownership (Falconbridge) |
|
|
|
Orebody located below former Onaping mine, accessible via Craig mine infrastructure |
|
|
|
Indicated resources of 14.6 million tonnes grading 2.52% nickel and 1.15%
copper, and an additional 1.2 million tonnes of inferred resources grading 3.6%
nickel and 1.2% copper |
|
|
|
Falconbridge continues research on enabling technologies to mine safely at greater depths |
Key Facts
|
|
100% ownership (Inco) |
|
|
|
Located adjacent to Falconbridges Thayer-Lindsley mine (shown left) |
|
|
|
Contains copper, nickel and precious metals |
|
|
|
Two mineralized zones, no shaft on property |
|
|
|
Mineralization continues on to Falconbridge property at depth (approximately 2,000 level) |
Important Legal Information
This communication is being made in respect of Inco Limiteds proposed combination with
Falconbridge Limited. Inco has filed with the U.S. Securities and Exchange Commission (SEC) a
registration statement on Form F-8 (containing an offer to purchase and a share exchange take-over
bid circular) and amendments thereto, and, if required, will file other documents with the SEC in
connection with the proposed combination. Falconbridge has filed a Schedule 14D-9F and amendments
thereto with the SEC in connection with Incos offer and has filed and, if required, will file
other documents regarding the proposed combination with the SEC.
INVESTORS AND SECURITYHOLDERS ARE URGED TO READ THE REGISTRATION STATEMENT AND ANY OTHER RELEVANT
DOCUMENTS FILED OR TO BE FILED WITH THE SEC WHEN THEY BECOME AVAILABLE BECAUSE THEY WILL CONTAIN
IMPORTANT INFORMATION.
Investors and security holders may obtain copies of the registration statement and Incos and
Falconbridges SEC filings free of charge at the SECs website (www.sec.gov). In addition,
documents filed with the SEC by Inco may be obtained free of charge by contacting Incos media or
investor relations departments. Documents filed with the SEC by Falconbridge may be obtained free
of charge by contacting Falconbridges investor relations department.
Filings made by Inco and Falconbridge with Canadian securities regulatory authorities, including
filings made in connection with the offer, are available at www.sedar.com.