UNITED STATES
                       SECURITIES AND EXCHANGE COMMISSION
                              Washington, DC 20549

                                    FORM 8-K


                                 CURRENT REPORT
     Pursuant to Section 13 or 15(d) of The Securities Exchange Act of 1934

                Date of Report (Date of earliest event reported):
                                 April 08, 2007

                       CHINA RECYCLING ENERGY CORPORATION
             (Exact name of registrant as specified in its charter)


           Nevada                      000-12536                  90-0093373
 (State or other jurisdiction   (Commission File Number)        (IRS Employer
      of incorporation)                                      Identification No.)

                         Services-Business Services, NEC
    0000721693                     [7389]                          06628887
(Central Index Key)         (Standard Industrial                (Film Number.)
                                Classification)


                               429 Guangdong Road
                                 Shanghai 200001
                           People's Republic of China
          (Address of principal executive offices, including zip code)

                                (86-21) 6336-8686
              (Registrant's telephone number, including area code)

                                 Not Applicable
         (Former name or former address, if changed since last report.)


Check  the  appropriate  box  below  if the  Form  8-K  filing  is  intended  to
simultaneously  satisfy the filing obligation of the registrant under any of the
following provisions (see General Instruction A.2. below):

|_|  Written  communications  pursuant to Rule 425 under the  Securities Act (17
     CFR 230.425)

|_|  Soliciting  material pursuant to Rule 14a-12 under the Exchange Act (17 CFR
     240.14a-12)

|_|  Pre-commencement   communications  pursuant  to  Rule  14d-2(b)  under  the
     Exchange Act (17 CFR 240.14d-2(b))

|_|  Pre-commencement   communications  pursuant  to  Rule  13e-4(c)  under  the
     Exchange Act (17 CFR 240.13e-4(c))







Item 1.01 Entry into a Material Definitive Agreement.

On April 08, 2007, the Board of Directors of China Recycling Energy  Corporation
("Registrant")  approves  and  makes  effective  a TRT  Project  Joint-Operation
Agreement  ("Joint-Operation  Agreement",  please  see  Exhibit  10.1)  which is
conditionally  entered on February 01, 2007 between Shanghai TCH Data Technology
Co.,   Ltd.   ("TCH")   and  Xi'an   Yingfeng   Science  and   Technology   Co.,
Ltd.("Yingfeng").  TCH is a wholly owned sub-subsidiary of Registrant.  Yingfeng
is a Chinese company that is located in Xi'an,  Shaanxi Province,  China, and is
engaging in the business of designing,  selling,  installing,  and operating top
gas recovery  turbine system ("TRT") and other renewable  energy  products.  Its
primary  customers  are  steel  mills  and  companies.  TRT  is  an  electricity
generating  system that  utilizes the exhaust  pressure and heat produced in the
blast furnace of steel mill to generate electricity.

Under the Joint-Operation  Agreement, TCH and Yingfeng will jointly pursue a top
gas recovery turbine project ("Project") which is to design, construct,  install
and operate a TRT system in Xingtai Iron and Steel  Company,  Ltd.  ("Xingtai").
This project was originally  initiated by a Contract to Design and Construct TRT
System  ("Project  Contract"  Please see Exhibit  10.2)  entered by Yingfeng and
Xingtai on September  26, 2006.  Due to  Yingfeng's  lack of capital in pursuing
this Project  alone,  Yingfeng  sought TCH's  cooperation.  After  intensive and
substantial  inquiry  and  assessment,  TCH agreed to pursue this  project  with
Yingfeng in the joint-operation mode.

Under the terms of the Joint-Operation  Agreement, TCH provides various forms of
investments and properties into the Project including cash, hardware,  software,
equipments, major components and devices. In return, TCH becomes entitled to all
the rights,  titles,  benefits and interests that Yingfeng  originally had under
the Project  Contract,  including  but not limited to the cash  payment  made by
Xingtai on regular basis and other property rights and interests.

Yingfeng remains liable for providing all the manpower,  expertise and skills to
design, construct,  install, maintain and operate the TRT system under the terms
of the Project Contract and also takes  responsibility  to manage the properties
that TCH possesses in this Project. As for consideration,  TCH will make monthly
payment  of  30,000  RMB  Yuan   (approximately  US  $  3,900)  to  Yingfeng  as
compensation for their effort in managing TCH's properties.

Prior to the approval by the Board of  Registrant,  TCH and Yingfeng  have taken
several  preliminary actions in preparation for the full pursuit of the Project,
including  selecting and  purchasing  necessary  components and software for TRT
system,  organizing  and  training  the  technician  team  for the  Project  and
developing the construction and installation plan for the TRT system.


Item 9.01 Financial Statements and Exhibits
(d) Exhibits

Exhibit No.    Description
--------------------------------------------------------------------------------

 10.1      TRT Project Joint-Operation Agreement between TCH and Yingfeng.

 10.2     Contract  to Design and  Construct  TRT System  between  Yingfeng  and
          Xingtai






                                   SIGNATURES

     Pursuant to the  requirements  of the Securities  Exchange Act of 1934, the
registrant  has duly  caused  this  report  to be  signed  on its  behalf by the
undersigned hereunto duly authorized.

                                              China Recycling Energy Corporation

Date: April 08, 2007

                                                              /s/Guohua Ku
                                                              ------------
                                                                 Guohua Ku
                                                          President and Chairman



                                  EXHIBIT INDEX

Exhibit No.    Description
--------------------------------------------------------------------------------

  10.1    TRT Project Joint-Operation Agreement between TCH and Yingfeng.

  10.2    Contract  to Design and  Construct  TRT System  between  Yingfeng  and
          Xingtai